Omnia Gold Mine

Contract Date: April 2016 - November 2016

Contract Value: US$ 700,000

Location: Manica Province, Mozambique

Client: Omnia Mine

  • Contracted to carry out Bulk Excavations and side casting operations on Alluvial Gold Mine
  • 2 x 80 Ton Excavators and D8 Dozers

Shoprite ( Terrace Africa)

Contract Date – April 2016 - July 2016

Contract Value – US$ 450,000

Location - Tete, Mozambique

Development and construction of two shopping malls based in Tete

  • Bulk Earthworks
  • Roadworks and Drainage

Mall of Tete Phase 1 (Earthworks)

Contract Date: May 2015 - November 2015

Contract Value:  US$ 1.4million

Location: Tete, Mozambique

Client: McCormick Property Developments for Largest Shopping Mall in Tete

  • Bulk Earthworks
  • Roads
  • Drainage

Major Road Construction

Contract Date – July 2014 - November 2014

Contract Value – US$ 4.2 million

Location - Tete

Client - Mota-Engil Mozambique

Contracted to carry out Roadwork’s of 14km’s linking the new bridge spanning the Zambeze River

  • Bush Clearing
  • Topsoil Stripping
  • Road bed preparation
  • Load haul, place and process, fill layer, selected sub grade, sub base and base layer.
  • PI Sand Layer and Geotextile
  • Major Culverts
  • Drainage works and lined side drains
  • Rip Rap
  • Borrow Pit Rehabilitation

Benga Mine - Rio Tinto

Completion Date – April 2015

Contract Value – US$ 7,9million

Location - Mozambique

Client - Rio Tinto

Contracted to assist EQSTRA with Topsoil, Subsoil and Bulk Waste stripping.

Total Volume Mined – 3.8 Million BCM’s in 26 Months

WATCH VIDEO  LETTER OF REFERENCE

Rio Tinto Exploration

Completion Date – 2012 - 2014

Contract Value – US$ 5.8million

Location - Mozambique

Client - Rio Tinto

Contracted to support RIO’s Exploration and Drilling program.

  • Construction of Major Access Roads and Filter Roads to remote Drill Sites
  • Drill Pad Construction, Sump Excavations, Rehabilitation
  • Water Delivery to Drill Rigs
  • Temporary Earth Bridges
  • Culvert Construction
  • Camp Establishment

Minas Moatize Coal Mine

Contract Date – 2011 - 2012

Contract Value – US$ 6.1million

Location - Moatize

Client - Minas Moatize (Beacon Hill Resources)

Principle Mining Contractor

Completion of Overburden Stripping, Bulk Waste and Coal Extraction

Phase 1 - Trial Pit Number 2 (TP2) 1.6 Million BCM’s
Phase 2 - Trial Pit Number 2 (TP2) 1.1 Million BCM’s

Riversdale Road Maintenance

Contract Date – March 2009 - 6 months

Contract Value – US$ 820,000

Location - Mozambique

Client - Riverdale Mocambique Limitada

Road Maintenance Project

Riversdale Road Contract

Completion Date – September 2008 - February 2009

Contract Value – US$ 314,290

Location - Mozambique

Client - Riverdale Mocambique Limitada

  • Plant Hire

Urban Water Supply and Sanitation Project Tete, Moçambique

Completion Date – 1996

Current Contract Value – US$ 2.9million

Location - Tete, Mozambique

Client: Ministry of Foreign Affairs, Danida Carl Bro International a/s, Denmark Tete

  • Construction of office and workshop buildings
  • Reservoirs and installation of boreholes, pumping mains, gravity & distribution mains,
  • Upgrading of existing system, and installation of domestic water meters.
  • Pumping Main
 400 mm PVC - 4000 m
  • 
Gravity Main 350 mm PVC - 3000 m
  • Distribution 90-160 mm PVC - 8000 m
600 m3
  • Reinforced Concrete Reservoirs - 2 no.
I
  • Installation of 2000 domestic water meters.
  • Rehabilitation of existing services

Mall of Tete Phase 2 (Civils and Paving)

Contract Date: June 2016 - November 2016

Contract Value: US$ 1.3million

Location: Tete, Mozambique

Client: McCormick Property Developments for Largest Shopping Mall in Tete

  • Bulk Earthworks, Terraces,
  • Internal and Main Roadwork’s,
  • Pavement Cement Stabilization,
  • Paving
  • Landscaping,
  • Irrigation,
  • Water and Sewer Reticulation

Mocambique Leaf Tobacco

Contract Date: April 2015 - September 2015

Contract Value: US$ 870,000

Location: Tete

1,400m3 of concrete works for factories and new storage shed.

  • All Earthworks,
  • Pavement Preparations
  • Reinforced concrete works and drainage systems

Aveng - Vale Rail Project Section 2

Contract Date: 10 months

Contract Value: US$ 2.4million

Project: Vale Rail Project

Location: Tete

Contracted to carry out all Major Cut to to Fill Operations of blasted material for the construction of the Vale Rail network linking TETE to the NACALA Port.

Madimba Lichinga/Cuamba Road Project

Completion Date – Oct 2007 - May 2008

Contract Value – US$ 542,000

Project – Road Re- Habilitation ANE

Location - Linchinga

Client: CMC

  • Supply of Plant and Supervision to CMC Africa Roads

Intraset ( Aveng)

Completion Date – 4 months

Contract Value – US$ 789,000

Project – Aveng Pre Cast Factory

Location - Tete

Client: Aveng

  • Bush Clearing
  • Terrance’s
  • Bulk earthworks
  • Internal roads
  • Deep excavations 10m and 15m
  • Water and Sewer reticulation.

Vale Mine Tailings Dam

Completion Date – 2013

Contract Value – US$ 1.1million

Project – Vale TSF #2

Location - Moatize

Client: Vale Mine

Subcontracted to construct Dam Wall Embankments

190,000 BCM - Load, Haul, Place and Process

Rio Tinto CHPP Terrace Construction

Completion Date – November 2012
Contract Value – US$ 480,000
Project – Benga Mine
Location - Moatize, Tete
Client: WBHO

Sub Contracted to WBHO to construct Platforms at Rio Tinto CHPP, to stockpile Thermal coal.

185,000 BCM’s, Load and Haul

Riversdale Mocambique Limitada (Bulk Sample Pit)

Completion Date – February 2010 - April 2010

Contract Value – US$ 400,000

Location: Tete

Client: Riversdale Mocambique Limitada

Trial Pit for Coal Sample Extraction - 225,000 BCM

Riversdale Mocambique Limitada

Completion Date – February 2009 - June 2009

Contract Value – US$ 635,000

Location: 

Client: Riversdale Mocambique Limitada

Construction of terraces for a 400 man mine camp

Tamega - Nampevo/Alto Mocue Road

Completion Date – 2006

Contract Value – US$ 281,000

Location - Nampevo

Client: Tamega

  • Supply of Road construction Equipment
  • Construction of Road to Bridge approaches

Rio Ligomha Road Project

Contract Date: Jan 2007 - Aug 2007

Contract Value: US$ 383,000

Project: Rio Ligomha Road

Location: Rio Ligomha

Client: CMC

  • Plant Hire to CMC Africa Roads
  • Project manage services
TOP